180 Walters Road Residential Subdivision
Complex challenges:
- Poor ground conditions during winter months.
- Enabling works to continue in peat soils during winter by managing the water table on site with a temporary holding pond and dewatering into the Awakeri channel.
- Design and the construction of recharge pits within narrow berm spaces.
- Preloading of platforms and monitoring movement of preload.
Location
180 Walters Road
Size
Stage 1: 6 lots, 0.1815ha Stage 2: 49 lots, 2.1022ha
Client
Walter Estate Ltd
Schedule
February 2019 – August 2019 (Earthworks Contract Only), Civil Works Stage 1 due to commence on EPA approval.
Other Projects

Lake Road Project
Maven Surveyors on site early to set building grid lines out before builders arrive on site. When time is critical Maven …

Duke Project
Maven Engineers worked closely with the Civil contractors and Auckland Council to overcome unforeseen contaminated soils, the …

Longshore Project
One of many sites in Long Bay which Maven are working alongside Development Advisory Services Limited (DASL). Maven will …